The second public announcement of environmental impact assessment information for the expansion project of nuclear technology utilization

Release time:

2019-09-03

Author:

Source:

  In accordance with the "Environmental Impact Assessment Law of the People's Republic of China" and the "Public Participation in Environmental Impact Assessment Measures" (Ministry of Ecology and Environment Order No. 4), before submitting the project for approval to the environmental protection administrative department, the main content and evaluation conclusions of the environmental impact assessment of the project will be publicized for a second time to solicit opinions and suggestions from the public. We hope that the public will actively participate and provide opinions and suggestions on the project construction. The announcement is as follows:

I. Project Overview

   Project Name: Hunan Jumper Technology Co., Ltd. Nuclear Technology Utilization Expansion Project

   Construction Location: No. 46, Lufeng Road, Yuelu District, Changsha City, Hunan Province (within the workshop of Times Mining Machinery)

   Construction Unit: Hunan Jumper Technology Co., Ltd.

   Preparation Unit: Hunan He'an Environmental Technology Co., Ltd.

II. Construction Content and Scale:

  It is planned to annually produce and sell 15 industrial CT machines (intelligent image X-ray ore sorting machines, maximum voltage 380kV, maximum current 8mA) for ore dressing operations.

III. Overview of Major Environmental Impacts

1. The production and sales will be located in the existing Times Mining Machinery workshop; the construction phase will have no impact on the ecological environment.

2. The ore sorting machine will only generate X-rays when it is powered on for debugging, causing radiation impact on the environment. However, by strictly following the relevant instructions and management systems, the radiation impact on the external environment is relatively small.

IV. Countermeasures and Measures to Prevent or Mitigate Adverse Environmental Impacts

1. Reasonable Site Selection and Layout

  The project is located in the existing Times Mining Machinery workshop, surrounded by company workshops. After adopting good shielding measures, the impact on the surrounding environment is minimal, and the site selection is reasonable.

2. Adopt Effective Radiation Safety and Protection Measures

  The shielding of the project's ore sorting machine is mainly composed of the equipment's own shielding. This reduces the impact of radiation on the external environment.

  Clear radioactive signs are set up in the production and sales areas. Safety and protection facilities and necessary safety alarm devices or work signals should be set up at the entrance, with safety measures to prevent misoperation and prevent accidental exposure of workers and the public.

  Establish a specialized radiation safety and environmental protection management institution, gradually establish and improve relevant rules and regulations, implement safety, security, and environmental protection measures, and formulate radiation accident emergency plans.

3. Three Aspects of Radioactive Workers

  Radioactive workers will receive training and assessment on radiation safety and protection professional knowledge and relevant laws and regulations, and obtain radiation protection training certificates; at the same time, pre-employment health checks and annual checks will be conducted as required, and personal dose detection will be conducted for radioactive workers as required.

4. Equip Protective Supplies and Monitoring Instruments

  Equip protective supplies and monitoring instruments that are suitable for the type and level of radiation, including personal dose measurement alarms and radiation monitoring instruments.

5. Set up Ventilation Devices

  The ore sorting machine area of the project should be equipped with ventilation devices to ensure an effective ventilation rate of 3 times/h or more, which can meet the relevant requirements.

6. Comprehensive Conclusion

  After earnestly implementing various environmental protection measures, the impact of various pollutants discharged by the project on the surrounding environment is relatively small, the site selection is feasible, and the coordination of economic benefits, social benefits, and environmental benefits can be achieved. Therefore, from the perspective of environmental protection, the construction of this project is feasible.

V. Network Link of Public Opinion Form

1. Network link of the full text of the draft environmental impact assessment report for soliciting opinions and methods and channels for reviewing the paper report

  Full text network link of the environmental impact assessment report: http://www.hnjumper.com/

2. Methods and channels for reviewing the paper report: You can ask the construction unit and the environmental impact assessment unit for it.

VI. Network Link of Public Opinion Form

1. Public participation opinion form download address: http://www.hnjumper.com/ or Appendix 1

2. Environmental impact assessment report download address: http://www.hnjumper.com/ or Appendix 2

VII. Scope and Main Matters of Soliciting Public Opinions

1. Scope of Soliciting Public Opinions

  Citizens, legal persons, or representatives and units of other organizations within 50m of the project that may be affected by the project.

2. Matters Needing Attention When Soliciting Public Opinions

① Your opinions on the potential impact of the project on the surrounding environment;

② Your opinions and suggestions on the environmental protection aspects of the project construction.

VIII. Name and Contact Information of the Construction Unit

   Construction Unit: Hunan Jumper Technology Co., Ltd.

   Mailing Address: Rooms 903 and 904, Building 8, Xin Cheng Science and Technology Park, No. 588, Yuelu West Avenue, Changsha High-tech Zone

   Postal Code: 410013

   Contact Person: Yang Chengjiao

   Email: junpkj@163.com

   Contact Number: 18974894864

IX. Name and Contact Information of the Environmental Impact Assessment Institution Undertaking the Assessment

   Construction Unit: Hunan He'an Environmental Technology Co., Ltd.

   Mailing Address: No. 26, Binhu West Road, Changsha County, Changsha City, Hunan Xianghe Building

   Postal Code: 410013

   Contact Person: Mao Junjie

   Email: 15243653457@139.com

X. Main Methods and Public Announcement Time for Soliciting Public Opinions

  To widely solicit opinions and suggestions from all sectors of society on the environmental protection work of this project, a public announcement is hereby made. The announcement period is 10 working days from the date of the announcement. The public can express their opinions and views on the construction of this project and the environmental impact assessment work through letters, telephone calls, emails, or other convenient methods to the construction unit. In order for your valuable opinions to be processed and responded to promptly, please provide detailed contact information when expressing your opinions. The download link for the public participation survey form can be found at the bottom of the website.

  Hunan Jumper Technology Co., Ltd.

  2019-9-1