Public Notice of Environmental Impact Assessment for the Expansion Project of Nuclear Technology Utilization
In accordance with the "Environmental Impact Assessment Law of the People's Republic of China" and the "Public Participation in Environmental Impact Assessment Measures" (Ministry of Ecology and Environment Order No. 4), the environmental impact information of this project is hereby announced, and public opinions and suggestions are solicited.
I. Name and Summary of the Construction Project
1. Project Name: Hunan Jumper Technology Co., Ltd. Nuclear Technology Utilization Expansion Project
2. Construction Unit: Hunan Jumper Technology Co., Ltd.
3. Construction Location: No. 46, Lufeng Road, Yuelu District, Changsha City, Hunan Province (within the workshop of Shi Dai Mining Machinery)
4. Project Nature: Expansion
5. Construction Content and Scale: It is planned to produce and sell industrial CT machines (intelligent image X-ray ore selection machines, with a maximum voltage of 380kV and a power of 25KW), which belong to Class II radiation devices.
II. Name and Contact Information of the Construction Unit
Construction Unit: Hunan Jumper Technology Co., Ltd.
Mailing Address: Room 903, 904, Building 8, Xin Cheng Technology Park, No. 588, Yuelu West Avenue, Changsha High-tech Zone
Postal Code: 410013
Contact Person: Wang Wei
Email: junpkj@163.com
Contact Number: 18274980897
III. Name and Contact Information of the Environmental Impact Assessment Agency Undertaking the Assessment Work
Construction Unit: Hunan Nuclear Safety Environmental Technology Co., Ltd.
Mailing Address: No. 26, Binhu West Road, Changsha County, Changsha City
Postal Code: 410013
Contact Person: Mao Junjie
Email: 15243653457@139.com
Contact Number: 15243653457
IV. Work Procedures and Main Work Content of Environmental Impact Assessment
1. Evaluation Work Procedures: The main work procedures of the environmental impact assessment are accepting the evaluation commission, conducting project overview surveys, conducting on-site surveys and monitoring of the environmental quality conditions around the project, and compiling the environmental impact assessment report.
2. Main Work Content: Based on the investigation of the environmental quality status around the project construction site, the environmental impact that may be caused after the project construction will be analyzed, predicted and evaluated, and countermeasures and measures to prevent or mitigate adverse environmental impacts will be proposed, and methods and systems for follow-up monitoring will be formulated.
V. Main Matters for Soliciting Public Participation
1. Are you satisfied with the local environmental quality conditions?
2. What are your biggest concerns about the proposed project?
3. What do you think are the main environmental problems of the proposed project?
4. What environmental protection measures do you think the proposed project should focus on?
5. What are the impacts of the proposed project on you (including both positive and negative impacts)?
6. What aspects of environmental impact are you concerned about? Such as noise, atmosphere, wastewater, solid waste, radiation, etc.
7. What is your attitude towards the construction of this project and your opinions on other environmental protection work?
VI. Scope and Main Matters of Soliciting Public Opinions
1. Scope of Soliciting Public Opinions
Citizens, legal persons, or representatives and units of other organizations within 50m around this project that may be affected by this project.
2. Matters to Note When Soliciting Public Opinions
① Your opinions on the potential impact of this project on the surrounding environment;
② Your opinions and suggestions on the environmental protection aspects of the construction of this project.
VII. Network Link of Public Opinion Form
Public participation opinion form submission address: http://www.hnjumper.com/ or Appendix 1
Public participation opinion form download address: http://www.hnjumper.com/ or Appendix 1
VIII. Main Methods and Public Announcement Time for Soliciting Public Opinions
In order to widely solicit opinions and suggestions from all sectors of society on the environmental protection work of this project, it is hereby announced. The announcement period is within 10 working days from the date of announcement. The public can express their opinions and views on the construction of this project and the environmental impact assessment work through letters, telephone calls, emails, or other convenient methods to the construction unit. In order for your valuable opinions to be processed and fed back in a timely manner, please provide detailed contact information when expressing your opinions. The download link for the public participation survey form can be found at the bottom of the website.
Hunan Jumper Technology Co., Ltd.
2019-05-23
Previous:
Next:
Recommended information